|
Method - Air spray, brush and roller
Theoratical Coverage - 11m2 / litre depending on application method and film thickness
Dilution - Xylene or butyl acetate
Direction Of Use 1. Ensure painting surfaces are free from dirt, rust, grease and other contaminants. 2. Dilute with thinner if necessary depends on the application method and film thickness 3. 2 coats are recommended to obtain high gloss finish.
Drying Time
| • Surface dry |
|
:2 to 3 hours |
| • Touch dry |
|
:5 hours |
| • Hard dry |
|
:24 hours |
Overcoating Time • 24 hours
Cleaning • Wash with mineral spirit or xylene.
|